What's Behind the Wall: Hazardous Materials, Concealed Conditions and How a Renovation Gets Priced in BC

Nobody can price a house they haven't looked inside, and every house built before you owned it has something in the walls. Some of it is harmless. Some of it is asbestos, lead, an oil tank nobody mentioned, wiring an insurer will not cover, or a foundation that was never bolted down. The difference between a renovation that lands on budget and one that becomes a story told at dinner parties is almost never the kitchen. It is what was found behind the wall, and whether it was found before the price or after.
This is what older houses in Greater Victoria tend to hide, what the law now requires before anyone touches them, and how a renovation can be priced so that a surprise on site becomes a line item rather than a dispute.
Asbestos: the survey is not optional
Under WorkSafeBC's regulation, before demolition or renovation work begins on a building, the owner and every employer responsible for the work must ensure a qualified person inspects it to identify hazardous materials and produces a written report. Every municipality in the region has turned that into a permit condition: Victoria, Saanich, Oak Bay and North Saanich all require a hazardous-materials survey for any building constructed fully or partly before 1990, and Oak Bay requires a clearance letter confirming the asbestos is out before the permit issues.
The 1990 date is not arbitrary. WorkSafeBC has identified more than 3,000 building materials used in homes before 1990 that may contain asbestos: vinyl floor tile and linoleum, roofing felt, vermiculite insulation, stucco, pipe insulation, drywall joint compound, the backing on light fixtures, ceiling tiles, plaster, duct wrap, cement board and mastics. A material is treated as asbestos-containing at 0.5 per cent by weight, and the only way to know is a laboratory test of a sample. Asbestos was a factor in 61 of British Columbia's 181 workplace deaths in 2022.
Since January 1, 2024, asbestos abatement in BC is a licensed trade. Contractors who remove, repair, transport or dispose of asbestos-containing material, or who sample and survey for it, must hold a WorkSafeBC licence, and their workers must hold a certificate; homeowners are expected to check the public registry before letting anyone start. Enforcement is real. In February 2026 WorkSafeBC fined a Chilliwack property company $55,119.54 for starting a boiler replacement without the hazardous-materials inspection, and in May 2026 a hotel company was fined $624,051.48 for asbestos and lead debris, uncertified workers and missing notices.
Lead is the second item on the survey. Health Canada's guidance is that homes built before 1960 probably contain lead paint, that exterior paint from 1960 to 1990 may, and that interiors from that period contain smaller amounts. Sanding or heat-stripping it is the wrong way to find out.
What this means for pricing: the survey comes first, before the drawings are finished, because the abatement cost belongs in the number and because the disposal has its own line. Hartland charges $214 per tonne for asbestos-containing waste in 2026, by appointment, double-bagged, with a pre-approval for any renovation or demolition load that cannot prove the building is post-1990.
The oil tank under the lawn
Houses in Greater Victoria heated with oil for decades, and the tanks are still under the lawns. Saanich's bylaw requires an underground tank to be removed once it has been permanently withdrawn from service or out of service for two years; since 2021 every removal permit requires soil testing by a certified environmental engineer, with remediation to clean fill and an engineer's report, and the permit costs $100, or $200 if the work is done without one. Victoria's bylaw uses the same two-year trigger, requires Fire Prevention to inspect the excavation before backfill, and notes that tanks typically last 15 to 25 years and that insurance may not cover a spill. Oak Bay counted about 1,800 residential underground tanks in 1998 and permits removal or inerting in place, while advising that some lenders and insurers require removal.
A tank is a renovation line item for three reasons: the permit and removal, the soil testing, and the remediation if the soil fails. The last of those is the one that cannot be priced until the tank is out, which is exactly why it is written into the contract as a concealed condition with the pricing rule agreed beforehand.
Wiring the insurer will ask about
Three generations of electrical work sit in Greater Victoria's housing stock, and insurers treat each differently. Knob-and-tube, common in houses built before 1950, is wiring most insurers are reluctant to cover at all. Aluminum branch wiring was installed in houses from roughly 1966 to 1974, and insurers class it, with knob-and-tube and 60-amp services, as high risk. Sixty-amp services were standard into the 1970s; a code change in 1972 set 100 amps as the minimum for houses over 80 square metres, and a modern house with a heat pump, an induction range and a car charger wants 200.
Electrical permits in most of the region come from Technical Safety BC, except in the City of Victoria, which runs its own and charges double for work done without one. A homeowner can take out a permit for work on a single-family home they own and occupy, but not on a house with a suite, a strata, or a home business; otherwise the work must be done by a licensed contractor who pulls the permit. A whole-home renovation in an older house almost always means a new panel and a service upgrade, which Metro Vancouver electricians priced at $5,500 to $12,000 for 100 to 200 amps in early 2026, and the wiring behind any wall that is opened is replaced while it is open.
The foundation, the bolts and the drains
Victoria is one of the highest-seismic-risk regions in Canada, and most houses here built before 1980 were never bolted to their foundations. The 2024 building code brought in stronger lateral bracing rules for new houses, in force for permits applied for since March 10, 2025, but nothing in the code requires an existing house to be retrofitted. A whole-home renovation is the natural moment: with the walls open, anchor bolts, shear walls and cripple-wall bracing are a modest addition to a project that is already there, and impossible to add cheaply afterward.
Two other things live below the main floor. Perimeter drains in older houses are often clay or concrete tile, which fails in ways PVC does not, and a camera inspection before pricing is the difference between a drain line in the contract and a basement full of water in November. And unreinforced or deteriorated concrete, common in houses from the first half of the last century, is the finding that most often turns a renovation into a rebuild.
How a renovation gets priced so the wall can't surprise you
Investigate before you price. That means the hazardous-materials survey, a camera down the drains, a look at the panel, the attic and the crawlspace, exploratory openings where the drawings depend on what is behind a finish, and moisture readings where there is any history of water. What is found goes into the drawings and the number.
What cannot be known until demolition is handled by the contract, not by hope. The standard Canadian construction contract, CCDC 2, treats concealed conditions as a defined event: subsurface or hidden physical conditions that differ materially from what the contract documents described must be reported in writing before they are disturbed and within five working days of being observed, after which the price and schedule are adjusted by change order. The same form puts hazardous substances in their own clause: the owner is responsible for identifying and listing them and for dealing with pre-existing ones, and bears the cost and delay if the contractor did not bring them. A good residential renovation contract does the same thing in plainer language. It names the categories that cannot be seen, states how each will be priced if found, and says who decides before the work continues. That is the difference between a surprise that is a line item and a surprise that is an argument.
Our own practice follows that order: look first, from the crawlspace up, with a hazardous-materials survey on anything built before 1990; put what we find in the drawings and the price; write what cannot be seen into the contract with the pricing rule agreed in advance; and, when something appears on site, photograph it, document it, price it under the terms already agreed, and get your approval before that part of the work goes on.
Questions we're asked
Does my house need an asbestos survey before a renovation? If any part of it was built before 1990, yes. WorkSafeBC requires it before the work starts and every municipality in Greater Victoria requires it before the permit.
Can I remove asbestos myself? Homeowners may dispose of small quantities at Hartland by appointment, double-bagged, under the facility's rules. Any contractor removing it must hold a WorkSafeBC licence and certified workers, and the renovation itself cannot proceed until the clearance is in hand.
I don't know if there's an oil tank. How do I find out? The fire department can tell you whether a tank was registered or decommissioned, and a scan of the yard finds the ones that weren't. Saanich and Victoria require removal once a tank has been out of service for two years, with soil testing.
Will my insurer cover a house with knob-and-tube? Most are reluctant to, and most treat knob-and-tube, aluminum branch wiring and 60-amp services as high risk. A whole-home renovation is the moment to replace all three.
What is a concealed condition in a contract? A physical condition hidden from view that differs materially from what the contract assumed. A well-written contract names the categories, says how each will be priced if found, and requires your approval before the affected work continues.
How do you price what you can't see? We don't. We investigate first, price what we find, and write the rest into the contract with the pricing rule agreed before we start.
Start a conversation