Anyone who gives you a price per square foot before there are drawings is estimating with your money. That is the honest starting point, and it is also not a useful one if you are trying to decide whether a custom home is within reach. So here are the numbers that are published, with their dates and what they leave out, followed by the list of things that actually move the price on a Greater Victoria lot. Read the second half more carefully than the first.


What the published benchmarks say


Altus Group, 2026 Canadian Cost Guide (April 2026). The national quantity surveyors put custom-built single-family homes in Vancouver at $490 to $1,250 per square foot of hard construction cost, up from $450 to $1,135 in their 2022 guide. The guide does not publish a Victoria row, and the figure is hard cost only: no land, no design fees, no permits, no servicing, no landscaping, no GST.

Statistics Canada, Building Construction Price Index (second quarter 2026, published July 2026). Victoria's residential construction prices rose 1.1 per cent in the quarter and 5.5 per cent over the year, the steepest annual rise among the fifteen cities measured, against 0.5 per cent for Vancouver and 2.3 per cent nationally. Statistics Canada attributed part of the metal and steel pressure to retaliatory tariffs.

Province of BC, standardized housing designs (August 2024). The Province's Class D estimates for its catalogue of small standardized homes put Nanaimo and Victoria at $275 to $425 per square foot against $350 to $475 for Vancouver, explicitly excluding soft costs, utility connections and rock blasting. Those are simple, repeatable designs, which is why the numbers are lower than any custom builder's.

Local builders (2025 to 2026). Published ranges from Victoria builders cluster at roughly $350 to $450 per square foot for a basic finish, $450 to $700 for mid-range and $600 to $900 for high-end, with some quoting $400 to $650 and up. These are marketing figures, not estimates, and they differ in what they include; two builders quoting $500 per square foot can be $200,000 apart on the same house once exclusions are read.

CMHC Housing Design Catalogue (costed at Q1 2025). Class B estimates with a plus-or-minus 15 per cent range, mid-range finishes, contingency excluded. Useful as a cross-check on small homes and suites, less so on a 4,000-square-foot custom house.

Put together: on a Peninsula lot in 2026, a custom home of the kind we build will usually land somewhere inside the Altus range once you convert it to Victoria pricing, and the Statistics Canada index says that range moved up more here in the past year than anywhere else in the country. Beyond that, the only number that means anything is the one built from drawings.


What a per-square-foot number leaves out


A square-foot figure is a hard-cost figure: the structure, the envelope, the systems and the finishes. It usually excludes the land; the design, engineering, survey, geotechnical and energy-advisor fees; the building permit and development cost charges; the services to the lot line and the driveway; landscaping; financing; GST; and any contingency. The Vancouver home builders' association's breakdown of a 2021 production home is a useful reminder of the proportions: construction was 29.7 per cent of the sale price, land 38.1 per cent, municipal fees and taxes 10.9 per cent, servicing 6.9 per cent, consultants, financing, overhead and profit the rest. On a custom home on your own lot the land is already yours, but the fees, servicing and soft costs are not, and they are rarely in the square-foot number.


The soft costs and taxes, itemized


Design and engineering. Architects in BC bill under the AIBC's schedule of services, usually as a percentage of construction cost or a fixed fee; a building designer costs less. Add a structural engineer, a geotechnical engineer on sloped or rocky ground, a land surveyor, and an energy advisor for the Step Code model and tests. One Island builder's published range for architecture and engineering on a custom build is $100,000 to $180,000; treat that as an order of magnitude, not a quote.

Building permit. Victoria charges 1.40 per cent of construction value plus a $100 application fee, with a further 1.40 per cent for plumbing and a small discount for sealed professional plans (September 2026 schedule). Saanich charges $100 for the first $1,000 of value, $13 per $1,000 up to $500,000 and $10 per $1,000 above that, plus a tiered application fee (September 2025).

Development cost charges. Saanich's bylaw totals $14,933 per single-family lot. Victoria charges $24,582 plus a $3,366 amenity cost charge. Sidney adopted new bylaws on September 14, 2026 totalling $18,344. Central Saanich's older bylaw runs about $6,100 plus the CRD's Peninsula water and wastewater charges. From April 2, 2027, the CRD's new Regional Water Supply DCC adds $9,044 per single-family dwelling in every municipality, with protection for permits applied for before September 9, 2027. The Victoria Residential Builders Association has estimated Saanich's total per house will rise from about $14,400 to about $23,400 once it is in.

Services. BC Hydro's standard connection fee since July 5, 2025 is $880 plus GST for an overhead single-phase service up to 200 amps and $1,400 for underground; the maximum customer contribution to a line extension is $2,798 per single-family dwelling for 2026–27, and larger services need a design deposit. Municipal water, sewer and storm connections are charged by each municipality; a septic system, a well and a long driveway on an unserviced lot are a budget line of their own, and one that can run from the low tens of thousands to well into six figures depending on the ground.

Property Transfer Tax on the lot. One per cent on the first $200,000, 2 per cent to $2,000,000, 3 per cent above that, and a further 2 per cent on residential value above $3,000,000. If the lot plus the completed house comes in at or under $1,100,000 and you live in it, a refund of the tax on the lot is available after the first year.

GST. Five per cent on the construction contract. The standard new housing rebate returns up to $6,300 and disappears at $450,000 of value, which rules it out for most custom homes here. The first-time home buyers' rebate in force since March 2026 returns the full GST on a new home up to $1,000,000, phasing out at $1,500,000, and applies to owner-built homes on parallel terms; it is worth up to $50,000 if you qualify.

Speculation and vacancy tax. The lot is exempt while reasonable steps are taken to develop it without undue delay, which the Province defines to include applying for permits, engaging designers and engineers, clearing and construction. The 2026 rate for Canadian owners rose to 1 per cent. Keep the paperwork that shows the steps.


The five things that move the price


The lot. Rock means blasting permits, drilling and a foundation designed around what is there; slope means retaining walls and engineered footings; an unserviced lot means a well, a septic field and a hydro extension; a waterfront or creekside lot means professional reports and setbacks that shrink the buildable area; a protected tree means a redesign. The Province's own cost estimates exclude rock blasting for a reason. One Victoria estimator's tool puts site preparation anywhere from $10,000 to $300,000, which is a fair statement of how much the ground can decide.

Size and complexity. Square footage is the obvious driver; the shape is the hidden one. Corners, roof forms, cantilevers, tall glazed walls to a view, and a plan that spreads across the site all cost more per square foot than a compact two-storey box with the same area. The Altus range is wide because it includes both.

Finish level. Cabinetry, stone, tile, flooring, windows, plumbing fixtures and appliances are where two houses of identical size part company by hundreds of thousands of dollars. This is also where allowances in a contract hide the real number; a house priced with selections made is a house whose price means something.

The energy code. Every municipality in the region requires Step 3 of the Energy Step Code, and most require Zero Carbon Level 4. Published costings put Step 3 at about 1 per cent over baseline, Step 5 at about 3 per cent and Level 4 at 1 per cent or less, before the savings on the hydro bill.

Tariffs and materials. Canada's counter-tariffs that took effect September 8, 2026 put a 50 per cent surtax on US steel and primary aluminum, structural steel, fasteners, plywood, laminated wood products, gypsum board and LED fixtures, 25 per cent on major appliances and sanitary ware, and 15 per cent on most heat pumps and air conditioners. On the US side, Canadian softwood lumber faces combined duties of 24.75 per cent after the October 2026 review plus a 10 per cent tariff, and US tariffs on cabinets and vanities are scheduled to rise to 50 per cent in January 2027. Altus has estimated US-sourced materials at about 8 per cent of an average project's cost, and the Canadian Construction Association puts US-made inputs at about a quarter of manufactured construction materials. The practical effect is that appliances, fixtures, steel, panel products and some cabinetry are the volatile lines, and that a contract should say who carries the next change.

A sixth driver applies off the Peninsula: a remote or island site adds barging, ferry scheduling, crew travel or accommodation and the absence of local trades. No published source puts a percentage on it, and we would not either, because it depends entirely on the site; it is priced from the access, in pre-construction.


How to budget, and how to read a quote


Quantity surveyors recommend a contingency of 3 to 5 per cent when the drawings are complete and coordinated, 5 to 10 per cent at the design-development stage, and 10 to 15 per cent on renovations; the common advice to custom home clients is 10 per cent, with the observation that overruns of 10 to 20 per cent are common when it is not held. The more decided the house is before the price, the smaller the contingency needs to be.

When you compare two quotes, compare four things before the totals. What the allowances are set at, and what they cover. What is excluded, and whether the exclusions are the expensive ones: site work, services, landscaping, permits, DCCs, GST. Who carries tariff and material price risk after signing. And whether the number is a fixed price, a cost-plus estimate or something in between, because a low cost-plus estimate costs nothing to write.


How we price

We price from drawings: finished plans, written specifications, selections made, the site investigated. Every line is priced from our own takeoffs rather than a square-foot factor, by people who have been pricing houses on this coast since 1998, and we tell you early, while changing your mind still costs nothing, whether the house you want fits the number you have in mind. Where a fixed price suits the project, we offer one, with no allowances to run over. Where cost-plus serves you better, we say so and explain why.


Questions we're asked


What does a custom home cost per square foot in Victoria? Published ranges in 2026 run from roughly $350 to $900 per square foot of hard cost depending on finish level, and Altus puts Vancouver custom homes at $490 to $1,250. None of those figures include land, soft costs, services, fees or GST. The number for your house comes from its drawings.

How much should I set aside beyond construction? Design and engineering, permits, development cost charges that run from about $6,000 to $28,000 depending on the municipality, hydro and municipal connections, site work, landscaping, GST and a contingency. On a serviced lot they add a meaningful fraction to the hard cost; on an unserviced one, more.

Do I pay GST on a custom home? Yes, 5 per cent on the construction. The standard rebate ends at $450,000; the first-time buyers' rebate, if you qualify, returns the full GST up to $1,000,000.

Are costs still rising? Victoria's residential construction prices rose 5.5 per cent in the year to the second quarter of 2026, the fastest in Canada, with tariffs cited as a cause. Rates and policy can move either way; the lot and the years you want in the house do not come back.

What is the cheapest way to reduce the cost? Simplify the form before you simplify the finishes. A compact plan with a simple roof on a flat, serviced lot is the cheapest house per square foot you can build; every departure is a choice, and should be priced as one.

Will you give me a number before drawings exist? We will tell you whether what you want fits what you'd like to spend, and show you where the money goes. A price comes from drawings.


Start a conversation


Tell us about the lot and the house in your head, and the number you have in mind. We'll tell you whether they fit, and what it would take to make them.



It's time for a home

built around you. 

Uncompromising Craftsmanship Since 1998

bottom of page